31. 4 point in HRC different to lifterscontacting or cavity steel. 斜頂和與其接觸的內(nèi)?;蜩偧谟捕壬嫌?度的差別(HRC)。
32. 4X size section , dimensioned toreflect the actual size. 水口及水口頂針的4倍放大視圖,按實(shí)際尺寸標(biāo)注。
33. General ,safety and handling. 常規(guī)、安全和搬運(yùn)要求。
34. Guided ejection recommended for mouldabove 100 tons clampcapacity, ejector pins of 1.5mm or smaller, or ejectorstroke longer than 50mm. 建設(shè)模具用于鎖模力超過(guò)100噸的注塑機(jī),或有1.5mm以下的頂針或頂出行程超過(guò)50mm時(shí),應(yīng)裝上頂針板導(dǎo)柱。
35. Guide pin cleared and vented?邊釘插入模板有否頂著及加疏氣空?
36. Hot manifold wired to print and checked?熱咀電線接位有否編號(hào)?
37. Horn pin clearance hole?斜邊與行位有否空間?
38. Hydraulic actuated slide together withelectrical limit switch. 行位采用油壓推動(dòng),配合安全電制。
39. Heaters fitted+0.002/-.000, leadstagged and connected toterminal. 熱嘴裝配,電線源頭、尾有否安裝穩(wěn)固。(+0.002/.000)。
40. Inserts keyed and numbered to preventincorrect assembly. 鑲件定位和編號(hào)以防止不正確的組裝。